We finished the headers and canister mount on Monday and cut and fitted the cowling yesterday. The fuel tank was the last item on the list and we literally finished it at the field ten minutes before the first flight.
Test fitting the second header pipe...
First flight...
There are numerous things to report:
* first, the hydraulic brakes worked perfectly. They will keep the plane from moving at fast idle and slow it down and stop it on a long landing.
* second, the nose spring steering damper worked well also. Was able to steer and make tight turns but still has enough give to keep from beating up the servo.
* third, the DA-150 has plenty of power. We did a few tweaks and the engine ran strong at the top end and with a good slow idle on the bottom end.
Test fitting the second header pipe...
First flight...
There are numerous things to report:
* first, the hydraulic brakes worked perfectly. They will keep the plane from moving at fast idle and slow it down and stop it on a long landing.
* second, the nose spring steering damper worked well also. Was able to steer and make tight turns but still has enough give to keep from beating up the servo.
* third, the DA-150 has plenty of power. We did a few tweaks and the engine ran strong at the top end and with a good slow idle on the bottom end.