Rain Delay !
Got the partitions in for the main wing panels up on the top shelf. 2 dividers....shorter panels on the far right that are 8' long or less and longer panels up to about 11' 9" in the middle. The far left side is for the fuselage plank that will hold the Arcus and Fox fuselages for now.....easy enough to change out the mounts for different fuselages up to about 11' 9" in length there (the width of that section is about 16" wide, so just about any fuselage or pair of smaller fuselages will fit, or it can be used for more wing panels if needed).
I used 1" aluminum angle that is 1/8" thick as an upper brace. The aluminum is attached to the inside roof rails of the trailer with self tapping metal screws (#8 3/4"). Should hold very well.
The bottoms of the dividers have 2" screws coming up through the floor of the shelf into the base of the dividers. Screws were put in every foot. This should secure them very well and keep everything nicely in place.
The PVC pipe arrived today and I started some preliminary measurements for making cradles for the fuselages. The Duo Discus X and the ASH 31mi will need some sections of the 12" in the from and then 4" or 6" to hold the rear down. Looks like it will work very well.
I found some great foam pad at EMS that is used as a sleeping pad underneath sleeping bags. The pad is 6' long and about 24" wide, good density, but it will absorb pressure well. This will be contact cemented to the PVC cradles once the shape and size of each is finalized. On the rear mount I'll have side flaps come out to wrap around the fuselage and protect it from the velcro strap (no need for the on the center mount as the velcro goes through the wing root and the front support doesn't use velcro).
When the storm breaks here I'll get back out and finish things up with everything and get some pictures taken as requested.
Got the partitions in for the main wing panels up on the top shelf. 2 dividers....shorter panels on the far right that are 8' long or less and longer panels up to about 11' 9" in the middle. The far left side is for the fuselage plank that will hold the Arcus and Fox fuselages for now.....easy enough to change out the mounts for different fuselages up to about 11' 9" in length there (the width of that section is about 16" wide, so just about any fuselage or pair of smaller fuselages will fit, or it can be used for more wing panels if needed).
I used 1" aluminum angle that is 1/8" thick as an upper brace. The aluminum is attached to the inside roof rails of the trailer with self tapping metal screws (#8 3/4"). Should hold very well.
The bottoms of the dividers have 2" screws coming up through the floor of the shelf into the base of the dividers. Screws were put in every foot. This should secure them very well and keep everything nicely in place.
The PVC pipe arrived today and I started some preliminary measurements for making cradles for the fuselages. The Duo Discus X and the ASH 31mi will need some sections of the 12" in the from and then 4" or 6" to hold the rear down. Looks like it will work very well.
I found some great foam pad at EMS that is used as a sleeping pad underneath sleeping bags. The pad is 6' long and about 24" wide, good density, but it will absorb pressure well. This will be contact cemented to the PVC cradles once the shape and size of each is finalized. On the rear mount I'll have side flaps come out to wrap around the fuselage and protect it from the velcro strap (no need for the on the center mount as the velcro goes through the wing root and the front support doesn't use velcro).
When the storm breaks here I'll get back out and finish things up with everything and get some pictures taken as requested.
Comment