Just a bit more details on the lay up in case someone wonder
Spar cap lay up is done on the core, first ribbon wet and flipped over, I work the epoxy with CC and a roller, before applying the second ribbon I put some epoxy down to wet lower face as I will not flip this one, once again roll roll roll to be sure that the carbon is wet
Sans titre by steffruelle, sur Flickr
Sans titre by steffruelle, sur Flickr
The first layer of FG is put in place on the veneer and the peelply used as hinging material is also put in place to check if it is in the right position
Then wet wit epoxy and CC, I use the roller for countours
Sans titre by steffruelle, sur Flickr
Then i just swap the panel in the bag, work great
Sans titre by steffruelle, sur Flickr
First panel get out at 1080g, quite happy of the weight
Sans titre by steffruelle, sur Flickr
Stéphane
Spar cap lay up is done on the core, first ribbon wet and flipped over, I work the epoxy with CC and a roller, before applying the second ribbon I put some epoxy down to wet lower face as I will not flip this one, once again roll roll roll to be sure that the carbon is wet
Sans titre by steffruelle, sur Flickr
Sans titre by steffruelle, sur Flickr
The first layer of FG is put in place on the veneer and the peelply used as hinging material is also put in place to check if it is in the right position
Then wet wit epoxy and CC, I use the roller for countours
Sans titre by steffruelle, sur Flickr
Then i just swap the panel in the bag, work great
Sans titre by steffruelle, sur Flickr
First panel get out at 1080g, quite happy of the weight
Sans titre by steffruelle, sur Flickr
Stéphane
Comment