Well that's too bad. I'll just have to live with it I guess. If there's something specific I'd like to see in more detail, I'll let you know. Proceed!
-
-
TJ, if I try to go larger then my ISP won't deal with it. I'll get the spinning 'activity wheel of death' at the top of the page and it will just sit there... spinning... spinning... spinning. Plus, I'm not very computer savvy to overcome the problem if it is a 'user' problem. If there is some detail of interest then ask away! Maybe I can explain better or get another picture. If I try to insert 'large' as opposed to 'medium' pictures then it won't work.
Balsa was laminated onto the nose then sanded back fair. I had put the lower fuse crutch on 'short of the mark'. Here is the end result with measurements. Last picture shows inside of nose. The release will get let into it, next.
That's all for now!
Last edited by ARUP; 11-13-2017, 12:33 PM. Reason: Tried to insert 'Large' vs 'Medium' pictures. It didn't work.
Leave a comment:
-
Michael, is it possible to use a slightly larger photo (file size)? The images in your thread are a bit small to really see the details of what you're describing.
-
Here's a pic of how the 1/64" ply is used as reinforcement. This is a spot where the longeron gets 'cracked' for it is a transition from curved forward to dead straight aft. The forward portion is mostly complete as far as uprights and diagonals are concerned. Some gussets were used in lieu of the sticks because whole formers will be fabricated and inserted into the box. The lower crutch (upper in pictures) is a little short at the nose end so balsa will get laminated onto it and sanded fair. A small balsa block will be let into the nose and, it too, will be sanded fair. Ain't balsa great?
Later!
Leave a comment:
-
Now that the rear of the fuselage box is built the lower crutch was added. BTW, medium balsa is being used to build the box. 1/64" ply was laminated onto the rear section of the longerons to help distribute stresses from the stabilator mount. The verticals' dimensions were obtained from the side elevation of plans, cut then glued in place. I use aliphatic wood glue. A straight edge holds the crutch straight as the verticals and diagonals are added. The rear section of the 'box' is done. Now I gotta get busy and build the front section! This has been fun!!!
That's all for now!
- Likes 1
Leave a comment:
-
The forward bows are done so they were attached to the main longerons. A straight edge was used to keep things... straight! Cross members and diagonals were fitted. The lower portion of the fuse was done the same except the more forward cross members and diagonals are to be added later. This will, hopefully, allow the lower portion to be 'gracefully' curved according to the side elevation of the plans. Both fuselage 'crutches' were sanded as a pair.
The fuselage 'box' is getting built inverted. The upper crutch was put back onto the board. The stabilator mount section parts were fabricated and epoxied in place. A square and bubble level were used for alignment as the weights were placed. This has to be true in all axes or the model will fly crooked.
Leave a comment:
-
Hi, Kevin! Glad you're here! How's the Weddell-Williams coming along? I haven't seen any posts lately on RCScalebuilder unless I'm just not very observant!
-
Great work on the stabilizer actuator Mike! I love your engineering!!
Leave a comment:
-
Making a great start Michael. If I don't stay focused on my own build you'll be finished before me!
Leave a comment:
-
The fuselage construction has started. The forward 'bows' for the nose will be laminations of 1/16" balsa with CF tow epoxied between each lamination. The fuselage will get built inverted at first in order to make the 'basic box' to which everything else is attached. I used the side elevation on the plan to cut packing blocks to support the laminations at the proper heights. I cut the bows using patterns taken from the plan.
This is fun stuff!
The first pair of laminations required a little 1/64" ply joiner. After this dried the first CF tow layer with another lamination of balsa was epoxied together. Two more layers to go! That's all for now!
Leave a comment:
-
Here are the wing rib patterns and center section balsa ribs. All the patterns have reference marks to locate spars. I have the CF wing tubes and sockets. They are 0.5" O.D. They will be doubled vertically between the spars. They will facilitate connecting the outer panels to the center section.
The elevator is an all moving 'pendulum' type. The mounting has to be robust and fluid with no slop. The stab will be built around a 0.25" CF tube pivot spar. The spar will be an interference fit in aluminum tubes within each stab half. This spar will be carried by a brass tube bushing in the fuselage. The tube ends were de-burred. The CF spar is removable for inspection. The elevator horn is built up from two micarta parts with balsa spacers. I drilled the large hole in each one first then fit them onto the brass bushing. Once satisfied with the fit they were cut to an 'L' shape on the band saw. The other two holes were drilled while the horn were stacked together on the bushing then they were sanded fair relative to each other. I epoxied balsa spacers between the two horns. The reason was I wanted the stab halves to not have any chance of becoming misaligned relative to each other. Probably overkill. I made two fuselage parts from 0.125" marine ply that carry the bushing. A pin from the horn will fit into tubes in the stab. This pin goes through an arc with elevator control input so I used the pin as a stylus via the horn to mark the masking tape on the ply. Then the arc slot was made using drills and small files. The pin will be epoxied in place, later. The pushrod end of the horn has a plastic bushing through which a small wire passes. The pushrod has a fiberglass tube on its end. The plastic bushing is an interference fit on its end. When these parts were assembled then the wire ends were epoxied to the horns.
Leave a comment:
-
All drawing is done! I have wing tubes and sockets in hand. The stab pass through spar of CF tube with attendant bushings and elevator control horn is at hand. Patterns are cut. I have ribs for the center section cut. More wood chopping and some pictures to come tomorrow!
- Likes 1
Leave a comment:
Leave a comment: